Shou Yifeng, Lin Weihua, Chen Shenghua. Design and Operation of Piggery Wastewater Treatment Project on Hangzhou Dengta Pig FarmJ. Transactions of the Chinese Society of Agricultural Engineering (Transactions of the CSAE), 2001, 17(7): 130-133.
    Citation: Shou Yifeng, Lin Weihua, Chen Shenghua. Design and Operation of Piggery Wastewater Treatment Project on Hangzhou Dengta Pig FarmJ. Transactions of the Chinese Society of Agricultural Engineering (Transactions of the CSAE), 2001, 17(7): 130-133.

    Design and Operation of Piggery Wastewater Treatment Project on Hangzhou Dengta Pig Farm

    • The piggery wastewater with higher concentration of pollutants was treated by the process of UASB+SBR in Hangzhou Dengta Pig Farm. In the project, the COD and NH3-N removal rates reached to 98% and 99% respectively. The final outflow with a COD and NH3-N less than 150 mg/L and 15 mg/L met the two-class requirement of national integrative discharging standard.
    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return